Master toilet flooring was also done. The mosaic in the shower area was not up yet. The shower area flooring was made about 1cm lower so as to prevent water from spilling out. The unfinished include shower screen installation, vanity, my glass bowl, tap, mirror, WC & other toilet accessories.
The room's windows were also extracted, leaving it bare. Our new silverish window frame with tinted black glass had arrived too. This week, the contractors were going to install the windows.